8334 Clairemont Mesa Blvd, San Diego, CA 24/7 emergency and rig-down support
  1. Home
  2. Services
  3. Turnaround Maintenance

Turnaround Maintenance

Planned shutdowns that finish on the day you said they would.

Overview

A turnaround is the most expensive fortnight in a facility's year. Every day of overrun is a day of lost throughput, and almost every overrun traces back to planning that was never tested.

Century Solutions supports downstream and midstream operators through the full turnaround cycle - scope development, planning, execution and close-out - for refinery units, gas processing plants and production facilities.

Our approach is deliberately unglamorous. We build the work scope from inspection data and reliability history rather than from the previous turnaround's scope list, challenge every item that cannot justify its place on the critical path, and lock the scope early enough that late additions become a decision rather than a surprise.

During execution, progress is measured against the plan daily and reported honestly. A turnaround that is running three days late in week one is recoverable; the same turnaround discovered to be three days late in the final week is not. We would rather deliver uncomfortable information early than comfortable information too late.

Capabilities

What this service covers

  • Scope development and challenge

    Building the work list from inspection findings, reliability data and risk ranking - and removing the items that do not earn their place.

  • Turnaround planning and scheduling

    Critical-path scheduling, resource levelling, contractor packaging and readiness milestones tracked from long before the shutdown date.

  • Execution management

    Day-to-day field supervision, progress measurement, contractor coordination and change control during the event.

  • Shutdown and start-up support

    Isolation planning, decontamination coordination, and sequenced start-up support to return the unit to production safely.

  • Inspection coordination

    Scheduling and integration of inspection scopes so that findings feed the work list rather than disrupting it.

  • Close-out and lessons learned

    Cost and schedule reconciliation, deferred work registers, and a documented basis for planning the next event better than this one.

Questions

About turnaround maintenance

Not covered here? Ask us directly.

For a major refinery unit, credible planning starts 12 to 18 months ahead. If you are inside six months and the scope is still moving, the priority shifts to protecting the critical path - which is a conversation worth having now rather than later.

Both models work. We can manage your existing contractor base, or package and manage the trades ourselves. What matters is that one party owns the schedule.

Let's talk about your next well.

Send us the location, depth and timing and you will get a costed response from someone who has worked the job - not a brochure.